GREASE,POLYUREA,NLGI 1,180KG

Material 4100091567 · GREASE · Plant 1000

AReduceExcess
Material
4100091567
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
37 d · P80 55 d
Unit price
Rp 186,912

Recommendation

  • 1.Forecast 6,247 KG/year: 1,593 unplanned (recency-weighted compound poisson (own history)) + 4,654 from the maintenance plan.
  • 2.Lead time ~37 days; expected demand during lead time 520 (incl. 358 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,010, order up to 1,719.
  • 4.Stock 2,564 exceeds the level to keep (2,025) by 539; the level includes the 2,025 used in the last turnaround.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 98% probability of demand in the next 90 days.
ML early warningLast turnaround used 2,025Single sourceAbnormal consumptionPlanned demand in lead time
On hand / on order
2,564 / 0
no open PO
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
1,010
safety stock 491
Rec. Max
1,719
order qty 709
Service level
100.0%
stockout risk now 0%
Unit price
Rp 186,912
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 11 days ago, 3 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2,100 units) excluded from the baseline.

Demand pattern Erratic · 30 issue days · 9 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 5 functional locations

4 with criticality A/B · 7,900 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-1649A
MOTOR OPERATED GATE VALVE
A50031.34
PX_PP-1726-M
MOTOR FOR PP-1726
A1,20021.05
PX_MOV-335A
MOTOR OPERATED GATE VALVE
A20000.06
PX_PP-500-M
MOTOR FOR PP-500
A3,00000.19
PX_KC-137A-M
MOTOR FOR KC-137A
C3,00000.57

Lead time and procurement

Lead time 37 ± 18 days (PO history, 14 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
18 Jul 2026PR03
Regular replenishment
15,990Rp 191,72316 Sept 202660 d
09 May 2026PR06
Regular replenishment
14,370Rp 187,35023 May 202614 d
10 Apr 2026PR03
Regular replenishment
5,183Rp 178,60113 Jun 202664 d
18 Jan 2026PR03
Regular replenishment
8,180Rp 191,63020 Feb 202633 d
19 Dec 2025PR03
Regular replenishment
8,738Rp 187,56109 Jan 202621 d
28 Nov 2025PR06
Regular replenishment
6,360Rp 186,47316 Dec 202518 d
23 Nov 2025PR03
Regular replenishment
8,115Rp 181,87723 Dec 202530 d
17 Nov 2025PR03
Regular replenishment
16,481Rp 188,67329 Dec 202542 d
18 Oct 2025PR06
Regular replenishment
4,612Rp 191,20309 Dec 202552 d
03 Oct 2025PR01
Import / long-lead
11,942Rp 184,90513 Dec 202571 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_MOV-1649ARe-greasing Gear Box MOV358
01 Feb 2027PX_KC-137A-MRe-greasing Bearing Motor2,148
03 Aug 2027PX_KC-137A-MRe-greasing Bearing Motor2,148

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026EmergencyPX_MOV-1649AMOV-1649A torque switch trip
26 Aug 2026LowPX_MOV-1649AMOV-1649A torque switch trip
31 Jul 2026EmergencyPX_PP-1726-MLeak from packing
17 Aug 2025MediumPX_PP-1726-MLeak from packing
06 Aug 2025MediumPX_MOV-1649AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 202625201000026093Corrective
31 Aug 202650203000017844Turnaround
30 Aug 202650201000018854Corrective
22 Aug 2026200201000025267Corrective
25 Jul 202625201000001320Corrective
20 Jul 202625201000028005Corrective
29 Jun 20261,000201000037337Corrective
24 May 202650201000019630Corrective
28 Apr 202625201000020066Corrective
07 Mar 202650201000036940Corrective
11 Feb 20265,000201000015609Corrective
03 Feb 2026200201000010732Corrective
29 Jan 202625201000039770Corrective
23 Jan 202650201000003072Corrective
09 Jan 202623,135201000034348Corrective