Sparely
DU

GREASE,POLYUREA,NLGI 3,1KG

Material 4100091568 · GREASE · Plant 1000

AReduceSlow-moving
Material
4100091568
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
GEMILANG TEKNIK LESTARI PT
Lead time
31 d · P80 34 d
Unit price
Rp 142,717

Recommendation

  • 1.Forecast 2,267 KG/year: 548 unplanned (recency-weighted compound poisson (own history)) + 1,718 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 46.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 330, order up to 819.
  • 4.Stock 4,774 exceeds the level to keep (819) by 3,955.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Last turnaround used 100Single sourceAbnormal consumptionSame description as 2 other material numbers
On hand / on order
4,774 / 0
no open PO
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
330
safety stock 284
Rec. Max
819
order qty 489
Service level
100.0%
stockout risk now 0%
Unit price
Rp 142,717
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 244 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1,100 units) excluded from the baseline.

Demand pattern Lumpy · 17 issue days · 6 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 1,225 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1881A-M
MOTOR FOR PP-1881A
A1,20000.19
PX_PP-810A-M
MOTOR FOR PP-810A
A2500.19

Lead time and procurement

Lead time 31 ± 21 days (PO history, 5 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
28 Mar 2026PR03
Regular replenishment
2,578Rp 140,85720 Apr 202623 d
11 Feb 2026PR03
Regular replenishment
4,279Rp 145,49107 Mar 202624 d
15 Dec 2025PR03
Regular replenishment
7,392Rp 151,14502 Jan 202618 d
14 Dec 2025PR05
Project / turnaround
4,771Rp 142,71725 Feb 202673 d
21 Jul 2025PR03
Regular replenishment
3,114Rp 141,54312 Aug 202522 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
19 Jan 2027PX_PP-1881A-MRe-greasing Bearing Motor859
06 Jul 2027PX_PP-1881A-MRe-greasing Bearing Motor859

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Jan 202650201000013677Corrective
16 Jan 202650201000022918Corrective
06 Jan 202650201000023869Corrective
03 Jan 2026200201000004145Corrective
15 Dec 202550201000034780Corrective
05 Dec 202550201000021666Corrective
29 Nov 202525203000009623Turnaround
12 Nov 202525203000039046Turnaround
05 Nov 202550203000039255Turnaround
26 Oct 20255,000201000010024Corrective
18 Oct 20251,000201000026625Corrective
05 Oct 20251,000201000016100Corrective
17 Sept 202525201000013643Corrective
15 Sept 20255,000201000024595Corrective
01 Sept 20255,000201000026249Corrective