GREASE,COMPLEX,NLGI 3,1KG
Material 4100091664 · GREASE · Plant 1000
BReorderNormalSlow-moving
- Material
- 4100091664
- Category
- GREASE
- Base unit
- KG
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 178,490 (est.)
Recommendation
- 1.Forecast 4,617 KG/year: 321 unplanned (credibility blend: own history + installed-base prior) + 4,296 from the maintenance plan.
- 2.Lead time ~29 days; expected demand during lead time 26.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 525, order up to 1,148.
- 4.On hand 81 + on order 0 is at or below the reorder point: order 1,067 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1,067 KG
Rp 190.4M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
81 / 0
no open PO
Today Min / Max
11 / 34
static parameters in BoM
Rec. Min (reorder point)
525
safety stock 500
Rec. Max
1,148
order qty 623
Service level
99.9%
stockout risk now 5%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 240 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 44.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.
Installed on 2 functional locations
1 with criticality A/B · 4,200 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1352-M MOTOR FOR PP-1352 | B | 3,000 | 0 | 0.19 |
| PX_PP-1583A-M MOTOR FOR PP-1583A | S | 1,200 | 0 | 0.19 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Jan 2027 | PX_PP-1352-M | Re-greasing Bearing Motor | 2,148 |
| 03 Jul 2027 | PX_PP-1352-M | Re-greasing Bearing Motor | 2,148 |
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Feb 2026 | 50 | 201000023224 | Corrective |
| 11 Oct 2025 | 1,000 | 201000002143 | Corrective |