GREASE,POLYUREA,NLGI 2,180KG
Material 4100091712 · GREASE · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100091712
- Category
- GREASE
- Base unit
- KG
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 178,490 (est.)
Recommendation
- 1.Forecast 720 KG/year: 4.2 unplanned (installed-base failure prior (no history)) + 716 from the maintenance plan.
- 2.Lead time ~29 days; expected demand during lead time 0.3.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 247.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
16 / 0
no open PO
Today Min / Max
10 / 29
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
247
order qty 247
Service level
99.7%
stockout risk now 0%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 1 functional locations
1 with criticality A/B · 500 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1984A-M MOTOR FOR PP-1984A | A | 500 | 4 | 1.05 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Mar 2027 | PX_PP-1984A-M | Re-greasing Bearing Motor | 358 |
| 31 Aug 2027 | PX_PP-1984A-M | Re-greasing Bearing Motor | 358 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Jul 2026 | Medium | PX_PP-1984A-M | Install scaffolding at PP-1984A-M |
| 22 Apr 2026 | Low | PX_PP-1984A-M | Replace lamp as per PM finding |
| 23 Sept 2025 | Medium | PX_PP-1984A-M | [MSI-B-25-DDT-125] Permanent repair |
| 12 May 2025 | Low | PX_PP-1984A-M | Leak from packing |
Recent goods issues
Never issued in the 17-month history.