GREASE,LITHIUM,NLGI 1,0.4KG

Material 4100091718 · GREASE · Plant 1000

AReorderCriticalStockout
Material
4100091718
Category
GREASE
Base unit
KG
MRP type
Non Stock
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 758 KG/year: 42 unplanned (credibility blend: own history + installed-base prior) + 716 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 3.3.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 303.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 303 now.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
303 KG
Rp 54.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 47
Rec. Max
303
order qty 253
Service level
99.8%
stockout risk now 6%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 267 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 235.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 4 functional locations

2 with criticality A/B · 4,025 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-624A-M
MOTOR FOR KC-624A
A2500.57
PX_MOV-917D
MOTOR OPERATED GATE VALVE
B50030.48
PX_MOV-1302
MOTOR OPERATED GATE VALVE
C3,00000.06
PX_PP-1637A-M
MOTOR FOR PP-1637A
S50000.19

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
04 Nov 2026PX_PP-1637A-MRe-greasing Bearing Motor358
21 Apr 2027PX_PP-1637A-MRe-greasing Bearing Motor358

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_MOV-917DLeak from packing
08 May 2026MediumPX_MOV-917DInstall scaffolding at MOV-917D
19 May 2025MediumPX_MOV-917DInstall scaffolding at MOV-917D

Recent goods issues

Posting dateQtyOrderOrder type
07 Jan 202650201000029980Corrective
11 Dec 202550201000006737Corrective