Sparely
DU

GREASE,COMPLEX,NLGI 2,1KG

Material 4100091893 · GREASE · Plant 1000

AReduceNon-moving
Material
4100091893
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 324 KG/year: 2.3 unplanned (installed-base failure prior (no history)) + 322 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 0.2.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 5 exceeds the level to keep (0) by 5.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 3 functional locations

2 with criticality A/B · 3,225 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1864A-M
MOTOR FOR PP-1864A
A3,00010.19
PX_PP-361A-M
MOTOR FOR PP-361A
B20000.19
PX_PP-1177-M
MOTOR FOR PP-1177
C2500.19

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
31 Oct 2026PX_PP-1177-MRe-greasing Bearing Motor17.9
22 Nov 2026PX_PP-361A-MRe-greasing Bearing Motor143
02 May 2027PX_PP-1177-MRe-greasing Bearing Motor17.9
23 May 2027PX_PP-361A-MRe-greasing Bearing Motor143

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 May 2025LowPX_PP-1864A-MMegger test PP-1864A-M

Recent goods issues

Never issued in the 17-month history.