GREASE,POLYUREA,NLGI 3,0.4KG
Material 4100091911 · GREASE · Plant 1000
CReduceNon-moving
- Material
- 4100091911
- Category
- GREASE
- Base unit
- KG
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 178,490 (est.)
Recommendation
- 1.Forecast 72 KG/year: 0.8 unplanned (installed-base failure prior (no history)) + 72 from the maintenance plan.
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 2 exceeds the level to keep (0) by 2.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 52,298/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~13 days.
Installed on 1 functional locations
0 with criticality A/B · 50 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-556A-M MOTOR FOR PP-556A | C | 50 | 1 | 0.19 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 31 Dec 2026 | PX_PP-556A-M | Re-greasing Bearing Motor | 35.8 |
| 02 Jul 2027 | PX_PP-556A-M | Re-greasing Bearing Motor | 35.8 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 May 2025 | Low | PX_PP-556A-M | Install scaffolding at PP-556A-M |
Recent goods issues
Never issued in the 17-month history.