Sparely
DU

GREASE,POLYUREA,NLGI 2,16KG

Material 4100091960 · GREASE · Plant 1000

AReorderNormalBelow reorder point
Material
4100091960
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 18 KG/year: 18 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 1.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
  • 4.On hand 10 + on order 0 is at or below the reorder point: order 90 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
90 KG
Rp 16.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
8 / 12
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 49
Rec. Max
100
order qty 50
Service level
100.0%
stockout risk now 3%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 116 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 102.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-720
MOTOR OPERATED GATE VALVE
A2500.06

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
07 Jun 202650201000010448Corrective