Sparely
DU

GREASE,COMPLEX,NLGI 3,0.4KG

Material 4100092079 · GREASE · Plant 1000

BMonitorSlow-moving
Material
4100092079
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 94 KG/year: 94 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 7.5.
  • 3.A 96.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 200.
  • 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
17 / 0
no open PO
Today Min / Max
11 / 34
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
200
order qty 200
Service level
96.3%
stockout risk now 4%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 33.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 3,000 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-1508
MOTOR OPERATED GATE VALVE
B3,00020.91

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Jan 2026MediumPX_MOV-1508Leak from packing
08 Jul 2025MediumPX_MOV-1508Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
25 Jan 2026200201000008663Corrective