Sparely
DU

GREASE,POLYUREA,NLGI 2,180KG

Material 4100092383 · GREASE · Plant 1000

BReduceSlow-moving
Material
4100092383
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 5,967 KG/year: 1,635 unplanned (credibility blend: own history + installed-base prior) + 4,332 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 130.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 1,336 exceeds the level to keep (0) by 1,336.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Convert to Non StockPrice estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
1,336 / 0
no open PO
Today Min / Max
371 / 964
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 3%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 236 days ago, 0 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 23.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 2 functional locations

1 with criticality A/B · 3,025 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1892B-M
MOTOR FOR PP-1892B
B2510.19
PX_PP-1370C-M
MOTOR FOR PP-1370C
C3,00000.19

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
11 Nov 2026PX_PP-1892B-MRe-greasing Bearing Motor17.9
28 Nov 2026PX_PP-1370C-MRe-greasing Bearing Motor2,148
28 Apr 2027PX_PP-1892B-MRe-greasing Bearing Motor17.9
29 May 2027PX_PP-1370C-MRe-greasing Bearing Motor2,148

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 May 2025MediumPX_PP-1892B-MReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
07 Feb 20265,000201000038712Corrective