Sparely
DU

GREASE,LITHIUM,NLGI 2,0.4KG

Material 4100092614 · GREASE · Plant 1000

AReduceNon-moving
Material
4100092614
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 37 KG/year: 0.8 unplanned (installed-base failure prior (no history)) + 36 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 5 exceeds the level to keep (0) by 5.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Convert to Non StockPrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
5 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1776B-M
MOTOR FOR PP-1776B
A2500.19

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
30 Mar 2027PX_PP-1776B-MRe-greasing Bearing Motor17.9
28 Sept 2027PX_PP-1776B-MRe-greasing Bearing Motor17.9

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.