Sparely
DU

GREASE,POLYUREA,NLGI 3,1KG

Material 4100092767 · GREASE · Plant 1000

CReducePotentially obsolete
Material
4100092767
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 178,490 (est.)

Recommendation

  • 1.Forecast 0.8 KG/year: 0.8 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 8 exceeds the level to keep (0) by 8.
Convert to Non StockPrice estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
8 / 0
no open PO
Today Min / Max
5 / 16
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 178,490
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 52,298/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~13 days.

Installed on 1 functional locations

0 with criticality A/B · 1,200 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1156A-M
MOTOR FOR PP-1156A
C1,20010.19

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 May 2025MediumPX_PP-1156A-MInstall cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.