TUBE PLUG,EXCHANGER,MODEL AT252,NBR

Material 4100093343 · TUBE PLUG · Plant 1000

AReduceExcess
Material
4100093343
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
A (32 of 43 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
51 d · P80 50 d
Unit price
Rp 217,969

Recommendation

  • 1.Forecast 14 EA/year: 14 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~51 days; expected demand during lead time 1.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 23.
  • 4.Stock 569 exceeds the level to keep (23) by 546.
  • 5.Installed on 43 FuncLoc(s), 32 of them criticality A/B.
  • 6.ML early warning: 94% probability of demand in the next 90 days.
ML early warningLast turnaround used 6Single source
On hand / on order
569 / 0
no open PO
Today Min / Max
8 / 17
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
23
order qty 14
Service level
100.0%
stockout risk now 0%
Unit price
Rp 217,969
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 21 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Intermittent · 16 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 43 functional locations

32 with criticality A/B · 55 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-532B
PROPYLENE COOLER
A141.50
PX_HE-848C
COOLING WATER CONDENSER
A141.08
PX_HE-1074
C3 RECYCLE REBOILER
A131.08
PX_HE-275C
METHANOL TLE
A130.65
PX_HE-693B
ETHYLENE EXCHANGER
A331.08
PX_HE-149A
HYDROGEN COOLER
A120.65
PX_HE-1917B
DILUTION STEAM TLE
A121.08
PX_HE-1768
GASOLINE EXCHANGER
A410.65
PX_HE-234C
REFLUX EXCHANGER
A110.22
PX_HE-1108C
INHIBITOR TLE
A100.22
PX_HE-1797C
FUEL OIL PREHEATER
A100.22
PX_HE-1817C
WASH WATER TLE
A100.22

Lead time and procurement

Lead time 51 ± 27 days (PO history, 7 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
17 Aug 2026PR03
Regular replenishment
4Rp 217,96920 Sept 202634 d
16 Apr 2026PR03
Regular replenishment
6Rp 212,00215 Jun 202660 d
14 Mar 2026PR03
Regular replenishment
9Rp 226,44919 Apr 202636 d
26 Jan 2026PR03
Regular replenishment
7Rp 208,10124 Feb 202629 d
27 Nov 2025PR03
Regular replenishment
10Rp 219,55301 Jan 202635 d
13 Sept 2025PR03
Regular replenishment
8Rp 222,77605 Nov 202553 d
16 Jun 2025PR03
Regular replenishment
3Rp 209,01715 Jul 202529 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_HE-532BReplace lamp as per PM finding
24 Sept 2026LowPX_HE-848CHE-848C fouling
22 Sept 2026LowPX_HE-113DRetubing HE-113D
21 Sept 2026MediumPX_HE-693BRetubing HE-693B
19 Sept 2026MediumPX_HE-848CReplace lamp as per PM finding
06 Sept 2026HighPX_HE-193BInstall scaffolding at HE-193B
19 Aug 2026MediumPX_HE-113DInstall scaffolding at HE-113D
12 Aug 2026MediumPX_HE-981Install scaffolding at HE-981
04 Aug 2026MediumPX_HE-275CPainting HE-275C
02 Jul 2026LowPX_HE-1074Install scaffolding at HE-1074

Recent goods issues

Posting dateQtyOrderOrder type
10 Sept 20261201000038057Corrective
21 Aug 20262201000007325Corrective
20 Aug 20261201000007325Corrective
17 Jun 20261201000020554Corrective
08 Jun 20261201000039784Corrective
24 Apr 20261201000023719Corrective
25 Jan 20262201000021700Corrective
05 Jan 20261201000017531Corrective
04 Jan 20261201000017531Corrective
25 Dec 20251201000035080Corrective
24 Dec 20252203000033370Turnaround
20 Dec 20251203000033370Turnaround
19 Dec 20251203000033370Turnaround
19 Dec 20252203000033370Turnaround
04 Dec 20251201000014476Corrective
Sparely