TUBE PLUG,EXCHANGER,TYPE IV372,GRAPHITE

Material 4100093366 · TUBE PLUG · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100093366
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
A (22 of 26 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
125 d · P80 151 d
Unit price
Rp 925,221

Recommendation

  • 1.Forecast 4.9 EA/year: 4.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~125 days; expected demand during lead time 1.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 12.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 7 now.
  • 5.Long lead time: 80% of deliveries took up to 151 days and the fastest seen in its category 29 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 26 FuncLoc(s), 22 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 6.5M · order by 01 Oct 2026
Expected arrival ≈ 125 days
Long-leadSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
12
order qty 5
Service level
100.0%
stockout risk now 1%
Unit price
Rp 925,221
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 107 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 26 functional locations

22 with criticality A/B · 33 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1483A
C4 PRODUCT COOLER
A1113.22
PX_HE-532B
PROPYLENE COOLER
A141.50
PX_HE-848C
COOLING WATER CONDENSER
A141.08
PX_HE-1393C
QUENCH WATER PREHEATER
A131.08
PX_HE-1768
GASOLINE EXCHANGER
A110.65
PX_HE-274C
QUENCH OIL REBOILER
A110.22
PX_HE-535C
FUEL OIL COOLER
A110.22
PX_HE-1229B
DILUTION STEAM REBOILER
A100.22
PX_HE-1524B
SLOP OIL CONDENSER
A100.22
PX_HE-1797C
FUEL OIL PREHEATER
A100.22
PX_HE-232C
ETHYLENE PREHEATER
A100.22
PX_HE-322C
LEAN AMINE EXCHANGER
A100.22

Lead time and procurement

Lead time 125 ± 62 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
16 Dec 2025PR03
Regular replenishment
1Rp 925,22112 Sept 2026270 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_HE-532BReplace lamp as per PM finding
24 Sept 2026LowPX_HE-848CHE-848C fouling
23 Sept 2026MediumPX_HE-1483AHE-1483A fouling
22 Sept 2026LowPY_HE-1205BLeak from packing
19 Sept 2026MediumPX_HE-848CReplace lamp as per PM finding
26 Aug 2026MediumPX_HE-1393CHE-1393C tube leak
23 Aug 2026HighPX_HE-1393CReplace lamp as per PM finding
21 Aug 2026LowPX_HE-1483AReplace lamp as per PM finding
02 Aug 2026LowPY_HE-1205BRetubing HE-1205B
20 Jul 2026LowPY_HE-1205BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
16 Jun 20261204000008401Preventive
09 May 20261201000013238Corrective
04 May 20261201000036238Corrective