TUBE PLUG,EXCHANGER,MODEL AV897,SS316
Material 4100093385 · TUBE PLUG · Plant 1000
AReduceSlow-moving
- Material
- 4100093385
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (11 of 14 FuncLocs A/B)
- Supplier
- BUANA TEKNIK SENTOSA PT
- Lead time
- 71 d · P80 83 d
- Unit price
- Rp 444,128
Recommendation
- 1.Forecast 3.6 EA/year: 3.6 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~71 days; expected demand during lead time 0.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
- 4.Stock 11 exceeds the level to keep (9) by 2.
- 5.Installed on 14 FuncLoc(s), 11 of them criticality A/B.
- 6.ML early warning: 43% probability of demand in the next 90 days.
ML early warningSingle source
On hand / on order
11 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 444,128
PO history
ML early warning: 43% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 254 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.
Installed on 14 functional locations
11 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-534C SEAL OIL TLE | A | 1 | 3 | 0.65 |
| PX_HE-432D INHIBITOR COOLER | A | 1 | 2 | 0.65 |
| PX_HE-1025 BFW PREHEATER | A | 1 | 1 | 0.22 |
| PX_HE-1569D DEMIN WATER TLE | A | 1 | 0 | 0.22 |
| PX_HE-1596B HYDROGEN TLE | A | 1 | 0 | 0.22 |
| PX_HE-1693C CAUSTIC TLE | A | 1 | 0 | 0.22 |
| PX_HE-754 BOTTOM EXCHANGER | A | 1 | 0 | 0.22 |
| PX_HE-1968B FLUSHING OIL COOLER | B | 1 | 4 | 1.50 |
| PX_HE-694B FEED PREHEATER | B | 1 | 2 | 1.08 |
| PX_HE-694C LEAN AMINE CONDENSER | B | 1 | 2 | 0.65 |
| PX_HE-182C LEAN AMINE PREHEATER | B | 1 | 1 | 0.22 |
| PX_HE-1283C SEAL OIL PREHEATER | C | 1 | 4 | 1.50 |
Lead time and procurement
Lead time 71 ± 48 days (PO history, 3 PO lines) · on-time 29%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Apr 2026 | PR03 Regular replenishment | 2 | Rp 444,128 | 05 Jun 2026 | 50 d |
| 02 Mar 2026 | PR01 Import / long-lead | 2 | Rp 457,598 | 15 Jun 2026 | 105 d |
| 12 Dec 2025 | PR03 Regular replenishment | 3 | Rp 443,851 | 23 Jan 2026 | 42 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Aug 2026 | Medium | PX_HE-410D | Leak from packing |
| 29 Jul 2026 | Low | PX_HE-410D | HE-410D tube leak |
| 16 Jul 2026 | Low | PX_HE-694B | HE-694B fouling |
| 28 Jun 2026 | Low | PX_HE-410D | HE-410D tube leak |
| 19 Jun 2026 | Medium | PX_HE-694C | Leak from packing |
| 11 May 2026 | Medium | PX_HE-1968B | HE-1968B tube leak |
| 16 Apr 2026 | Medium | PX_HE-1968B | Replace lamp as per PM finding |
| 26 Feb 2026 | Medium | PX_HE-1283C | Replace lamp as per PM finding |
| 07 Feb 2026 | Medium | PX_HE-534C | Retubing HE-534C |
| 06 Dec 2025 | Medium | PX_HE-1968B | HE-1968B fouling |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jan 2026 | 1 | 201000009101 | Corrective |
| 20 Jan 2026 | 1 | 201000011893 | Corrective |
| 20 Dec 2025 | 1 | 201000005339 | Corrective |
| 19 Dec 2025 | 1 | 201000005339 | Corrective |
| 13 Sept 2025 | 1 | 201000037115 | Corrective |
| 23 Jul 2025 | 1 | 201000002428 | Corrective |
| 17 Jul 2025 | 1 | 201000030814 | Corrective |
| 17 May 2025 | 1 | 201000019229 | Corrective |