Sparely
DU

TUBE PLUG,EXCHANGER,TYPE GN407,A105

Material 4100093438 · TUBE PLUG · Plant 1000

AReduceNon-moving
Material
4100093438
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~77 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 6 exceeds the level to keep (3) by 3.
  • 5.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
4 / 9
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 153.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 10 functional locations

5 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1903
RICH AMINE CONDENSER
A121.08
PX_HE-726A
SLOP OIL EXCHANGER
A100.22
PX_HE-1287D
CHARGE GAS CONDENSER
B110.22
PX_HE-168D
FUEL OIL REBOILER
B100.22
PX_HE-1877D
SEAL OIL COOLER
B100.22
PX_HE-403
BOTTOM EXCHANGER
C162.36
PX_HE-1986B
DILUTION STEAM TLE
C131.08
PX_HE-1369A
CAUSTIC COOLER
C100.22
PX_HE-1966D
ETHYLENE CONDENSER
C100.22
UT_HE-536
FLUSHING OIL CONDENSER
C100.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026HighPX_HE-403[MSI-B-26-XHT-352/M] Replace line
19 Sept 2026MediumPX_HE-403Cleaning HE-403
21 Jul 2026MediumPX_HE-1986BLeak from packing
15 Jun 2026EmergencyPX_HE-403[MSI-B-26-KHW-216/M] Replace line
23 May 2026EmergencyPX_HE-1986B[MSI-B-26-WXC-105] Permanent repair
26 Mar 2026MediumPX_HE-403Install scaffolding at HE-403
24 Nov 2025LowPX_HE-1903HE-1903 tube leak
29 Aug 2025MediumPX_HE-403Retubing HE-403
26 Jul 2025LowPX_HE-403HE-403 tube leak
01 Jun 2025MediumPX_HE-1903Leak from packing

Recent goods issues

Never issued in the 17-month history.