TUBE PLUG,EXCHANGER,MODEL GX784,SS316
Material 4100093455 · TUBE PLUG · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100093455
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (5 of 6 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 123 d · P80 188 d
- Unit price
- Rp 397,026
Recommendation
- 1.Forecast 4.6 EA/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~123 days; expected demand during lead time 1.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 17.
- 4.On hand 5 + on order 3 is at or below the reorder point: order 9 now.
- 5.Long lead time: 80% of deliveries took up to 188 days and the fastest seen in its category 29 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
- 7.ML early warning: 50% probability of demand in the next 90 days.
Proposed purchase requisition
9 EA
Rp 3.6M · order by 01 Oct 2026
Expected arrival ≈ 123 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
5 / 3
next delivery 04 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 11
Rec. Max
17
order qty 5
Service level
100.0%
stockout risk now 2%
Unit price
Rp 397,026
PO history
ML early warning: 50% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 217 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 953.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.
Installed on 6 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-492C CONDENSATE TLE | A | 1 | 1 | 0.22 |
| PX_HE-272 SLOP OIL EXCHANGER | B | 1 | 3 | 1.08 |
| PX_HE-554 CHARGE GAS TLE | B | 1 | 2 | 0.65 |
| PX_HE-126A CHARGE GAS PREHEATER | B | 3 | 0 | 0.22 |
| PX_HE-391 CHARGE GAS TLE | B | 4 | 0 | 0.22 |
| PX_HE-1753 METHANOL TLE | S | 1 | 3 | 1.50 |
Lead time and procurement
Lead time 123 ± 81 days (PO history, 5 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Jul 2026 | PR01 Import / long-lead | 1 | Rp 397,026 | 25 May 2027 open | 303 d |
| 01 Jul 2026 | PR06 Regular replenishment | 2 | Rp 407,297 | 04 Oct 2026 open | 95 d |
| 04 Jan 2026 | PR06 Regular replenishment | 1 | Rp 386,938 | 19 May 2026 | 135 d |
| 28 Oct 2025 | PR03 Regular replenishment | 2 | Rp 400,868 | 05 Apr 2026 | 159 d |
| 11 Jun 2025 | PR06 Regular replenishment | 2 | Rp 391,345 | 16 Aug 2025 | 66 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | Medium | PX_HE-272 | Install cover plate for MCP cracking |
| 13 Sept 2026 | Medium | PX_HE-554 | Cleaning HE-554 |
| 29 Aug 2026 | Medium | PX_HE-1753 | [MSI-B-26-DUZ-254/M] Replace line |
| 09 Apr 2026 | Low | PX_HE-1753 | Leak from packing |
| 19 Mar 2026 | Medium | PX_HE-272 | Replace lamp as per PM finding |
| 28 Aug 2025 | Medium | PX_HE-1753 | Cleaning HE-1753 |
| 14 May 2025 | Low | PX_HE-492C | PSM25/HE-492C tube leak |
| 12 May 2025 | Medium | PX_HE-272 | Leak from packing |
| 04 May 2025 | Medium | PX_HE-554 | Install scaffolding at HE-554 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Feb 2026 | 2 | 201000016385 | Corrective |
| 25 Feb 2026 | 3 | 201000016385 | Corrective |
| 25 Feb 2026 | 1 | 201000016385 | Corrective |