TUBE PLUG,EXCHANGER,MODEL GX784,SS316

Material 4100093455 · TUBE PLUG · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100093455
Category
TUBE PLUG
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
123 d · P80 188 d
Unit price
Rp 397,026

Recommendation

  • 1.Forecast 4.6 EA/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~123 days; expected demand during lead time 1.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 17.
  • 4.On hand 5 + on order 3 is at or below the reorder point: order 9 now.
  • 5.Long lead time: 80% of deliveries took up to 188 days and the fastest seen in its category 29 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 50% probability of demand in the next 90 days.
Proposed purchase requisition
9 EA
Rp 3.6M · order by 01 Oct 2026
Expected arrival ≈ 123 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
5 / 3
next delivery 04 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 11
Rec. Max
17
order qty 5
Service level
100.0%
stockout risk now 2%
Unit price
Rp 397,026
PO history
ML early warning: 50% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 217 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 953.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 6 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-492C
CONDENSATE TLE
A110.22
PX_HE-272
SLOP OIL EXCHANGER
B131.08
PX_HE-554
CHARGE GAS TLE
B120.65
PX_HE-126A
CHARGE GAS PREHEATER
B300.22
PX_HE-391
CHARGE GAS TLE
B400.22
PX_HE-1753
METHANOL TLE
S131.50

Lead time and procurement

Lead time 123 ± 81 days (PO history, 5 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jul 2026PR01
Import / long-lead
1Rp 397,02625 May 2027
open
303 d
01 Jul 2026PR06
Regular replenishment
2Rp 407,29704 Oct 2026
open
95 d
04 Jan 2026PR06
Regular replenishment
1Rp 386,93819 May 2026135 d
28 Oct 2025PR03
Regular replenishment
2Rp 400,86805 Apr 2026159 d
11 Jun 2025PR06
Regular replenishment
2Rp 391,34516 Aug 202566 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026MediumPX_HE-272Install cover plate for MCP cracking
13 Sept 2026MediumPX_HE-554Cleaning HE-554
29 Aug 2026MediumPX_HE-1753[MSI-B-26-DUZ-254/M] Replace line
09 Apr 2026LowPX_HE-1753Leak from packing
19 Mar 2026MediumPX_HE-272Replace lamp as per PM finding
28 Aug 2025MediumPX_HE-1753Cleaning HE-1753
14 May 2025LowPX_HE-492CPSM25/HE-492C tube leak
12 May 2025MediumPX_HE-272Leak from packing
04 May 2025MediumPX_HE-554Install scaffolding at HE-554

Recent goods issues

Posting dateQtyOrderOrder type
26 Feb 20262201000016385Corrective
25 Feb 20263201000016385Corrective
25 Feb 20261201000016385Corrective