TUBE PLUG,EXCHANGER,SIZE LW281,SS304
Material 4100093458 · TUBE PLUG · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100093458
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 85 d · P80 151 d
- Unit price
- Rp 1.6M
Recommendation
- 1.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~85 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 6 now.
- 5.Long lead time: 80% of deliveries took up to 151 days and the fastest seen in its category 29 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 9.6M · order by 01 Oct 2026
Expected arrival ≈ 85 days
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 3%
Unit price
Rp 1.6M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 45 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 741.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.
Installed on 5 functional locations
5 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1797C FUEL OIL PREHEATER | A | 1 | 0 | 0.22 |
| PX_HE-931B ETHYLENE CONDENSER | A | 1 | 0 | 0.22 |
| PX_HE-1751C FLUSHING OIL COOLER | B | 2 | 2 | 0.65 |
| PX_HE-1482D ETHYLENE TLE | B | 3 | 0 | 0.22 |
| PX_HE-263B RICH AMINE TLE | B | 1 | 0 | 0.22 |
Lead time and procurement
Lead time 85 ± 62 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 May 2026 | PR03 Regular replenishment | 1 | Rp 1.6M | 13 Sept 2026 | 109 d |
| 01 Oct 2025 | PR06 Regular replenishment | 2 | Rp 1.6M | 27 Dec 2025 | 87 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Dec 2025 | Medium | PX_HE-1751C | Retubing HE-1751C |
| 18 May 2025 | Medium | PX_HE-1751C | Install scaffolding at HE-1751C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Aug 2026 | 2 | 201000037592 | Corrective |
| 17 Aug 2026 | 1 | 201000037592 | Corrective |
| 10 Sept 2025 | 1 | 201000025945 | Corrective |