TUBE PLUG,EXCHANGER,TYPE MC864,NBR

Material 4100093468 · TUBE PLUG · Plant 1000

AReduceNon-moving
Material
4100093468
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~77 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 192 exceeds the level to keep (2) by 190.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
192 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 87.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 4 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1334B
BOTTOM CONDENSER
A182.36
PX_HE-554
CHARGE GAS TLE
B420.65
PX_HE-732
REFLUX PREHEATER
B110.22
PX_HE-643D
DILUTION STEAM COOLER
B100.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2026MediumPX_HE-554Cleaning HE-554
28 Aug 2026MediumPX_HE-1334BInstall scaffolding at HE-1334B
07 May 2026MediumPX_HE-1334BInstall scaffolding at HE-1334B
29 Mar 2026MediumPX_HE-1334BHE-1334B tube leak
01 Mar 2026MediumPX_HE-1334BHE-1334B fouling
13 Feb 2026MediumPX_HE-1334B[MSI-B-26-MEX-353] Permanent repair
10 Feb 2026LowPX_HE-1334BLeak from packing
28 Nov 2025EmergencyPX_HE-1334BHE-1334B tube leak
17 May 2025LowPX_HE-1334BLeak from packing
06 May 2025MediumPX_HE-732[MSI-B-25-PVJ-331] Permanent repair

Recent goods issues

Never issued in the 17-month history.