Sparely
DU

TUBE PLUG,EXCHANGER,MODEL YT163,INCOLOY

Material 4100093478 · TUBE PLUG · Plant 1000

AMonitorInsurance gap
Material
4100093478
Category
TUBE PLUG
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~77 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 1%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 33.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 6 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-535C
FUEL OIL COOLER
A110.22
PX_HE-1003D
C4 PRODUCT COOLER
B110.22
PX_HE-526A
COOLING WATER REBOILER
B400.22
PY_HE-965B
RECYCLE ETHANE TLE
B100.22
PX_HE-1261
WASH WATER TLE
C100.22
PY_HE-1593C
LEAN AMINE REBOILER
C100.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2025MediumPX_HE-535CCleaning HE-535C
15 May 2025MediumPX_HE-1003DPSM25/Install scaffolding at HE-1003D

Recent goods issues

Never issued in the 17-month history.