TUBE PLUG,EXCHANGER,SIZE LH988,VITON

Material 4100093500 · TUBE PLUG · Plant 1000

AReorderCriticalStockout
Material
4100093500
Category
TUBE PLUG
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 11 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~77 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 11 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 2.5M · order by 01 Oct 2026
Expected arrival ≈ 77 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 30%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 11 functional locations

6 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-232C
ETHYLENE PREHEATER
A100.22
PX_HE-286C
BFW CONDENSER
A100.22
PX_HE-128C
METHANE CONDENSER
B121.08
PX_HE-1375C
FEED COOLER
B120.65
PX_HE-1188D
INHIBITOR REBOILER
B100.22
PY_HE-1680D
PROPYLENE CONDENSER
B100.22
PX_HE-1912
QUENCH OIL EXCHANGER
C141.08
PX_HE-1808D
BOTTOM COOLER
C110.22
PX_HE-1572C
ETHYLENE TLE
C100.22
PY_HE-1775A
QUENCH OIL PREHEATER
C100.22
PX_HE-952C
COOLING WATER COOLER
S100.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Aug 2026MediumPX_HE-1912Replace lamp as per PM finding
13 Mar 2026MediumPX_HE-1912Install scaffolding at HE-1912
12 Mar 2026MediumPX_HE-1912Leak from packing
06 Oct 2025LowPX_HE-1375CHE-1375C tube leak
05 Oct 2025MediumPX_HE-128CHE-128C tube leak
16 Jul 2025LowPX_HE-128CReplace lamp as per PM finding
29 May 2025MediumPX_HE-1912Leak from packing
22 May 2025LowPX_HE-1375CReplace lamp as per PM finding
14 May 2025MediumPX_HE-1808DInstall scaffolding at HE-1808D

Recent goods issues

Posting dateQtyOrderOrder type
15 Jan 20261201000035112Corrective
20 Dec 20251201000005770Corrective
11 Oct 20251201000015543Corrective