TUBE PLUG,EXCHANGER,MODEL XG57,GRAPHITE
Material 4100093574 · TUBE PLUG · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100093574
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 85 d · P80 151 d
- Unit price
- Rp 321,954
Recommendation
- 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~85 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 2 + on order 1 is at or below the reorder point: order 6 now.
- 5.Long lead time: 80% of deliveries took up to 151 days and the fastest seen in its category 29 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 85 days
Long-leadLast turnaround used 1Single sourceOpen PO
On hand / on order
2 / 1
next delivery 24 Mar 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
99.9%
stockout risk now 1%
Unit price
Rp 321,954
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 252 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 433.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-693B ETHYLENE EXCHANGER | A | 1 | 3 | 1.08 |
| PX_HE-397A GASOLINE REBOILER | B | 1 | 2 | 0.65 |
Lead time and procurement
Lead time 85 ± 62 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Sept 2026 | PR05 Project / turnaround | 1 | Rp 325,564 | 24 Mar 2027 open | 184 d |
| 08 Jul 2026 | PR03 Regular replenishment | 2 | Rp 318,343 | 18 Jul 2026 | 10 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_HE-693B | Retubing HE-693B |
| 19 Oct 2025 | Low | PX_HE-397A | Leak from packing |
| 02 Oct 2025 | Medium | PX_HE-693B | HE-693B fouling |
| 07 May 2025 | Medium | PX_HE-397A | Leak from packing |
| 03 May 2025 | High | PX_HE-693B | [MSI-B-25-ETN-117/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Jan 2026 | 3 | 206000038371 | Other maintenance |
| 24 Dec 2025 | 1 | 203000033370 | Turnaround |