TUBE PLUG,EXCHANGER,TYPE PY213,CS

Material 4100093593 · TUBE PLUG · Plant 1000

BLong-leadReorderNormalSlow-moving
Material
4100093593
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
83 d · P80 109 d
Unit price
Rp 674,760

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~83 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 109 days and the fastest seen in its category 29 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 674,760 · order by 01 Oct 2026
Expected arrival ≈ 83 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 674,760
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 257 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 89.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~29 days.

Installed on 2 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1874C
METHANOL COOLER
B131.08
PX_HE-1783
PROPYLENE EXCHANGER
C320.22

Lead time and procurement

Lead time 83 ± 47 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
19 Jan 2026PR03
Regular replenishment
2Rp 674,76022 May 2026123 d
12 Sept 2025PR03
Regular replenishment
2Rp 678,45308 Dec 202587 d
03 Sept 2025PR03
Regular replenishment
1Rp 645,48902 Nov 202560 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jul 2026MediumPX_HE-1874CReplace lamp as per PM finding
23 Jun 2026LowPX_HE-1783Painting HE-1783
03 Mar 2026MediumPX_HE-1874CLeak from packing
14 May 2025LowPX_HE-1783Install scaffolding at HE-1783
03 May 2025MediumPX_HE-1874CHE-1874C fouling

Recent goods issues

Posting dateQtyOrderOrder type
17 Jan 20261201000023201Corrective