TUBE PLUG,EXCHANGER,TYPE FJ860,VITON

Material 4100093607 · TUBE PLUG · Plant 1000

AReduceExcess
Material
4100093607
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~77 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.Stock 85 exceeds the level to keep (5) by 80.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
85 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 86 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 695.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 5 functional locations

4 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-974
SLOP OIL CONDENSER
A300.22
PX_HE-786
ETHYLENE COOLER
B141.08
PX_HE-1365D
COOLING WATER TLE
B100.22
PX_HE-391
CHARGE GAS TLE
B400.22
PX_HE-1522
RECYCLE ETHANE REBOILER
C100.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Sept 2026MediumPX_HE-786Leak from packing
26 Jun 2026MediumPX_HE-786Painting HE-786
23 Dec 2025MediumPX_HE-786HE-786 tube leak
17 May 2025LowPX_HE-786Cleaning HE-786

Recent goods issues

Posting dateQtyOrderOrder type
07 Jul 20261201000006740Corrective
19 May 20251201000014175Corrective