TUBE PLUG,EXCHANGER,TYPE KP777,SS304
Material 4100093644 · TUBE PLUG · Plant 1000
BReorderCriticalStockout
- Material
- 4100093644
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 77 d · P80 151 d
- Unit price
- Rp 505,158 (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~77 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 77 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 16%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 224 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 131.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~29 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-354D INHIBITOR PREHEATER | B | 1 | 3 | 1.08 |
| PY_HE-418 QUENCH OIL EXCHANGER | C | 1 | 2 | 1.08 |
Lead time and procurement
Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_HE-354D | Cleaning HE-354D |
| 26 Jun 2026 | Medium | PY_HE-418 | Repair insulation HE-418 |
| 17 Feb 2026 | Medium | PX_HE-354D | HE-354D tube leak |
| 24 Jun 2025 | Low | PY_HE-418 | Replace lamp as per PM finding |
| 24 May 2025 | Medium | PX_HE-354D | Cleaning HE-354D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Feb 2026 | 1 | 201000006519 | Corrective |