TUBE PLUG,EXCHANGER,TYPE KA133,A105

Material 4100093896 · TUBE PLUG · Plant 1000

BMonitorInsurance gap
Material
4100093896
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~77 days; expected demand during lead time 0.0.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 1%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~29 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1788D
GASOLINE EXCHANGER
B100.22
PX_HE-463B
FUEL OIL PREHEATER
B100.22
PX_HE-1008A
C3 RECYCLE CONDENSER
C100.22
PX_HE-1966D
ETHYLENE CONDENSER
C100.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.