Sparely
DU

TUBE PLUG,EXCHANGER,TYPE NG175,A182F11

Material 4100093970 · TUBE PLUG · Plant 1000

BMonitorTAM reserve
Material
4100093970
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~77 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Used only during the last turnaround (2 EA): keep it for the next one instead of treating it as slow-moving.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 2Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 23.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~29 days.

Installed on 3 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-354D
INHIBITOR PREHEATER
B231.08
PX_HE-1192
SLOP OIL EXCHANGER
C172.36
PX_HE-593C
REFLUX REBOILER
C110.22

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_HE-354DCleaning HE-354D
10 Sept 2026MediumPX_HE-1192HE-1192 fouling
30 Jul 2026MediumPX_HE-1192HE-1192 tube leak
17 Feb 2026MediumPX_HE-354DHE-354D tube leak
07 Feb 2026EmergencyPX_HE-1192Cleaning HE-1192
01 Feb 2026MediumPX_HE-1192HE-1192 fouling
07 Jan 2026LowPX_HE-1192Retubing HE-1192
04 Jan 2026HighPX_HE-1192Painting HE-1192
13 Aug 2025MediumPX_HE-593CInstall scaffolding at HE-593C
24 May 2025MediumPX_HE-354DCleaning HE-354D

Recent goods issues

Posting dateQtyOrderOrder type
15 Nov 20251203000035490Turnaround
10 Nov 20251203000035490Turnaround