TUBE PLUG,EXCHANGER,MODEL PY243,GRAPHITE

Material 4100094104 · TUBE PLUG · Plant 1000

AReduceNon-moving
Material
4100094104
Category
TUBE PLUG
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
77 d · P80 151 d
Unit price
Rp 505,158 (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~77 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 7 exceeds the level to keep (2) by 5.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 60.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~29 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-574B
INHIBITOR TLE
A100.22
PX_HE-456
BFW EXCHANGER
B131.08
PY_HE-1557D
RICH AMINE EXCHANGER
B121.08

Lead time and procurement

Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 May 2026MediumPX_HE-456Install scaffolding at HE-456
27 Mar 2026MediumPY_HE-1557DReplace lamp as per PM finding
10 Nov 2025MediumPX_HE-456[MSI-B-25-MYF-239/M] Replace line
13 Aug 2025MediumPX_HE-456[MSI-B-25-ENU-158] Permanent repair
18 Jul 2025MediumPY_HE-1557DRetubing HE-1557D

Recent goods issues

Never issued in the 17-month history.