TUBE PLUG,EXCHANGER,SIZE DV624,VITON
Material 4100094160 · TUBE PLUG · Plant 1000
CReorderHighStockout
- Material
- 4100094160
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 77 d · P80 151 d
- Unit price
- Rp 505,158 (est.)
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~77 days; expected demand during lead time 0.2.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 EA
Rp 2.0M · order by 01 Oct 2026
Expected arrival ≈ 77 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.8%
stockout risk now 21%
Unit price
Rp 505,158
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 55 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~29 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1192 SLOP OIL EXCHANGER | C | 1 | 7 | 2.36 |
Lead time and procurement
Lead time 77 ± 62 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Medium | PX_HE-1192 | HE-1192 fouling |
| 30 Jul 2026 | Medium | PX_HE-1192 | HE-1192 tube leak |
| 07 Feb 2026 | Emergency | PX_HE-1192 | Cleaning HE-1192 |
| 01 Feb 2026 | Medium | PX_HE-1192 | HE-1192 fouling |
| 07 Jan 2026 | Low | PX_HE-1192 | Retubing HE-1192 |
| 04 Jan 2026 | High | PX_HE-1192 | Painting HE-1192 |
| 21 May 2025 | Low | PX_HE-1192 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Aug 2026 | 1 | 201000013265 | Corrective |