TUBE PLUG,EXCHANGER,MODEL FM276,MONEL
Material 4100094430 · TUBE PLUG · Plant 1000
CMonitorSlow-moving
- Material
- 4100094430
- Category
- TUBE PLUG
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA PERKASA ABADI PT
- Lead time
- 87 d · P80 151 d
- Unit price
- Rp 220,695
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~87 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 220,695
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 423 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~29 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1986B DILUTION STEAM TLE | C | 1 | 3 | 1.08 |
Lead time and procurement
Lead time 87 ± 62 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Nov 2025 | PR03 Regular replenishment | 1 | Rp 223,352 | 09 Apr 2026 | 153 d |
| 27 Sept 2025 | PR03 Regular replenishment | 2 | Rp 218,037 | 17 Nov 2025 | 51 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Jul 2026 | Medium | PX_HE-1986B | Leak from packing |
| 23 May 2026 | Emergency | PX_HE-1986B | [MSI-B-26-WXC-105] Permanent repair |
| 04 May 2025 | Medium | PX_HE-1986B | HE-1986B fouling |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Aug 2025 | 1 | 201000004140 | Corrective |
| 03 Aug 2025 | 1 | 201000004140 | Corrective |