TRAY VALVE,TYPE YF253,SS304
Material 4100094869 · TRAY VALVE · Plant 1000
AMonitorInsurance gap
- Material
- 4100094869
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (6 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 70 d · P80 104 d
- Unit price
- Rp 84,525 (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~70 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 5%
Unit price
Rp 84,525
Category + unit estimate
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 180.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 8 functional locations
6 with criticality A/B · 15 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1475 C3 RECYCLE STRIPPER | A | 1 | 2 | 0.81 |
| PX_CL-894 COOLING WATER COLUMN | A | 1 | 1 | 0.38 |
| PY_CL-1481 CONDENSATE COLUMN | A | 1 | 1 | 0.38 |
| PX_CL-159 C4 PRODUCT TOWER | A | 1 | 0 | 0.38 |
| PX_CL-1871 CHARGE GAS SCRUBBER | B | 4 | 6 | 2.09 |
| PX_CL-1224 QUENCH OIL STRIPPER | B | 4 | 1 | 0.38 |
| PX_CL-1165 HYDROGEN TOWER | S | 1 | 5 | 1.23 |
| PX_CL-264 HYDROGEN COLUMN | S | 2 | 2 | 1.23 |
Lead time and procurement
Lead time 70 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Aug 2026 | Emergency | PX_CL-1475 | Replace lamp as per PM finding |
| 12 Jun 2026 | Medium | PX_CL-1871 | Leak from packing |
| 11 Jun 2026 | Medium | PX_CL-1871 | Replace lamp as per PM finding |
| 13 May 2026 | Medium | PX_CL-1871 | Install scaffolding at CL-1871 |
| 13 Jan 2026 | High | PX_CL-1165 | Install scaffolding at CL-1165 |
| 07 Dec 2025 | Medium | PX_CL-1165 | Replace lamp as per PM finding |
| 01 Dec 2025 | Medium | PX_CL-1165 | Install scaffolding at CL-1165 |
| 14 Nov 2025 | Medium | PX_CL-264 | Leak from packing |
| 27 Sept 2025 | Medium | PX_CL-1165 | CL-1165 DP high |
| 10 Sept 2025 | Medium | PX_CL-1871 | Inspect CL-1871 internal |
Recent goods issues
Never issued in the 17-month history.