TRAY VALVE,TYPE YF253,SS304

Material 4100094869 · TRAY VALVE · Plant 1000

AMonitorInsurance gap
Material
4100094869
Category
TRAY VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
70 d · P80 104 d
Unit price
Rp 84,525 (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~70 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 5%
Unit price
Rp 84,525
Category + unit estimate
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 180.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 8 functional locations

6 with criticality A/B · 15 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-1475
C3 RECYCLE STRIPPER
A120.81
PX_CL-894
COOLING WATER COLUMN
A110.38
PY_CL-1481
CONDENSATE COLUMN
A110.38
PX_CL-159
C4 PRODUCT TOWER
A100.38
PX_CL-1871
CHARGE GAS SCRUBBER
B462.09
PX_CL-1224
QUENCH OIL STRIPPER
B410.38
PX_CL-1165
HYDROGEN TOWER
S151.23
PX_CL-264
HYDROGEN COLUMN
S221.23

Lead time and procurement

Lead time 70 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Aug 2026EmergencyPX_CL-1475Replace lamp as per PM finding
12 Jun 2026MediumPX_CL-1871Leak from packing
11 Jun 2026MediumPX_CL-1871Replace lamp as per PM finding
13 May 2026MediumPX_CL-1871Install scaffolding at CL-1871
13 Jan 2026HighPX_CL-1165Install scaffolding at CL-1165
07 Dec 2025MediumPX_CL-1165Replace lamp as per PM finding
01 Dec 2025MediumPX_CL-1165Install scaffolding at CL-1165
14 Nov 2025MediumPX_CL-264Leak from packing
27 Sept 2025MediumPX_CL-1165CL-1165 DP high
10 Sept 2025MediumPX_CL-1871Inspect CL-1871 internal

Recent goods issues

Never issued in the 17-month history.