TRAY VALVE,MODEL GO371,CS

Material 4100094901 · TRAY VALVE · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100094901
Category
TRAY VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI JAYA PT
Lead time
74 d · P80 104 d
Unit price
Rp 50,721

Recommendation

  • 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Long lead time: 80% of deliveries took up to 104 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 304,326 · order by 01 Oct 2026
Expected arrival ≈ 74 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 7%
Unit price
Rp 50,721
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 3 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-932
RICH AMINE COLUMN
A151.66
PX_CL-961
LEAN AMINE COLUMN
A131.23
PX_CL-268
CAUSTIC SCRUBBER
S383.38

Lead time and procurement

Lead time 74 ± 25 days (PO history + category, 2 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
24 May 2026PR03
Regular replenishment
1Rp 49,91405 Sept 2026104 d
23 May 2026PR06
Regular replenishment
2Rp 51,52819 Jul 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026LowPX_CL-268Replace lamp as per PM finding
11 Sept 2026MediumPX_CL-961[MSI-B-26-UAX-291] Permanent repair
31 Aug 2026LowPX_CL-932CL-932 DP high
30 Aug 2026LowPX_CL-961CL-961 DP high
20 Aug 2026MediumPX_CL-932CL-932 DP high
02 Jul 2026MediumPX_CL-932Inspect CL-932 internal
02 Jun 2026MediumPX_CL-932Install scaffolding at CL-932
23 Mar 2026LowPX_CL-268Inspect CL-268 internal
14 Nov 2025LowPX_CL-268Install scaffolding at CL-268
08 Nov 2025MediumPX_CL-268Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
13 May 20261201000021171Corrective