TRAY VALVE,MODEL GO371,CS
Material 4100094901 · TRAY VALVE · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100094901
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- CAHAYA INDUSTRI JAYA PT
- Lead time
- 74 d · P80 104 d
- Unit price
- Rp 50,721
Recommendation
- 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 6 now.
- 5.Long lead time: 80% of deliveries took up to 104 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 304,326 · order by 01 Oct 2026
Expected arrival ≈ 74 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 7%
Unit price
Rp 50,721
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 3 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-932 RICH AMINE COLUMN | A | 1 | 5 | 1.66 |
| PX_CL-961 LEAN AMINE COLUMN | A | 1 | 3 | 1.23 |
| PX_CL-268 CAUSTIC SCRUBBER | S | 3 | 8 | 3.38 |
Lead time and procurement
Lead time 74 ± 25 days (PO history + category, 2 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 May 2026 | PR03 Regular replenishment | 1 | Rp 49,914 | 05 Sept 2026 | 104 d |
| 23 May 2026 | PR06 Regular replenishment | 2 | Rp 51,528 | 19 Jul 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Low | PX_CL-268 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_CL-961 | [MSI-B-26-UAX-291] Permanent repair |
| 31 Aug 2026 | Low | PX_CL-932 | CL-932 DP high |
| 30 Aug 2026 | Low | PX_CL-961 | CL-961 DP high |
| 20 Aug 2026 | Medium | PX_CL-932 | CL-932 DP high |
| 02 Jul 2026 | Medium | PX_CL-932 | Inspect CL-932 internal |
| 02 Jun 2026 | Medium | PX_CL-932 | Install scaffolding at CL-932 |
| 23 Mar 2026 | Low | PX_CL-268 | Inspect CL-268 internal |
| 14 Nov 2025 | Low | PX_CL-268 | Install scaffolding at CL-268 |
| 08 Nov 2025 | Medium | PX_CL-268 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 May 2026 | 1 | 201000021171 | Corrective |