TRAY VALVE,SIZE MK189,GRAPHITE
Material 4100095493 · TRAY VALVE · Plant 1000
SReorderNormalBelow reorder point
- Material
- 4100095493
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- PRIMA TEKNOLOGI PERSADA PT
- Lead time
- 61 d · P80 66 d
- Unit price
- Rp 51,231
Recommendation
- 1.Forecast 3.5 EA/year: 3.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~61 days; expected demand during lead time 0.6.
- 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 7.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 5 now.
Proposed purchase requisition
5 EA
Rp 256,155 · order by 01 Oct 2026
Expected arrival ≈ 61 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
7
order qty 4
Service level
98.3%
stockout risk now 18%
Unit price
Rp 51,231
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 56 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~30 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-443 COOLING WATER SCRUBBER | S | 1 | 6 | 2.52 |
Lead time and procurement
Lead time 61 ± 23 days (PO history, 3 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Jan 2026 | PR06 Regular replenishment | 2 | Rp 50,488 | 01 Mar 2026 | 30 d |
| 19 Oct 2025 | PR03 Regular replenishment | 2 | Rp 54,222 | 13 Dec 2025 | 55 d |
| 13 Aug 2025 | PR03 Regular replenishment | 1 | Rp 51,231 | 25 Oct 2025 | 73 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Sept 2026 | Medium | PX_CL-443 | Replace lamp as per PM finding |
| 09 Jul 2026 | High | PX_CL-443 | CL-443 DP high |
| 25 Jun 2026 | Medium | PX_CL-443 | Leak from packing |
| 01 May 2026 | Medium | PX_CL-443 | Install scaffolding at CL-443 |
| 30 Jan 2026 | Low | PX_CL-443 | Replace lamp as per PM finding |
| 18 Jun 2025 | Medium | PX_CL-443 | PSM25/CL-443 DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Aug 2026 | 3 | 201000032768 | Corrective |