TRAY VALVE,TYPE UM539,CS
Material 4100095768 · TRAY VALVE · Plant 1000
AReorderCriticalStockout
- Material
- 4100095768
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 70 d · P80 104 d
- Unit price
- Rp 84,525 (est.)
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~70 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 422,624 · order by 01 Oct 2026
Expected arrival ≈ 70 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 18%
Unit price
Rp 84,525
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 479 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 656.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-658 RICH AMINE STRIPPER | A | 1 | 1 | 0.38 |
| PX_CL-933 SEAL OIL STRIPPER | A | 1 | 0 | 0.38 |
| PX_CL-443 COOLING WATER SCRUBBER | S | 1 | 6 | 2.52 |
Lead time and procurement
Lead time 70 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Sept 2026 | Medium | PX_CL-443 | Replace lamp as per PM finding |
| 09 Jul 2026 | High | PX_CL-443 | CL-443 DP high |
| 25 Jun 2026 | Medium | PX_CL-443 | Leak from packing |
| 01 May 2026 | Medium | PX_CL-443 | Install scaffolding at CL-443 |
| 30 Jan 2026 | Low | PX_CL-443 | Replace lamp as per PM finding |
| 12 Aug 2025 | Medium | PX_CL-658 | Install scaffolding at CL-658 |
| 18 Jun 2025 | Medium | PX_CL-443 | PSM25/CL-443 DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jun 2025 | 1 | 204000021154 | Preventive |