DEMISTER PAD,MODEL HF501,A182F11

Material 4100096541 · DEMISTER PAD · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100096541
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
A (13 of 17 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
100 d · P80 147 d
Unit price
Rp 9.8M

Recommendation

  • 1.Forecast 9.3 EA/year: 9.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~100 days; expected demand during lead time 2.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 16.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 14 now.
  • 5.Long lead time: 80% of deliveries took up to 147 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 17 FuncLoc(s), 13 of them criticality A/B.
  • 7.ML early warning: 35% probability of demand in the next 90 days.
Proposed purchase requisition
14 EA
Rp 137.3M · order by 01 Oct 2026
Expected arrival ≈ 100 days
Long-leadML early warningSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 10
Rec. Max
16
order qty 4
Service level
99.8%
stockout risk now 57%
Unit price
Rp 9.8M
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 367 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.

Installed on 17 functional locations

13 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-457
FEED SCRUBBER
A1113.80
PX_CL-962
PROPYLENE SCRUBBER
A183.38
PX_CL-1686
ETHYLENE SCRUBBER
A130.81
PX_CL-164
SEAL OIL STRIPPER
A100.38
PX_CL-797
C4 PRODUCT TOWER
A200.38
PX_VD-1479
RECYCLE ETHANE ACCUMULATOR
A100.08
PX_VD-1822
QUENCH OIL SURGE DRUM
A100.08
PY_CL-454
C3 RECYCLE TOWER
A100.38
PX_CL-348
SEAL OIL TOWER
B130.81
PX_CL-1699
DEMIN WATER COLUMN
B121.23
PX_VD-733
INHIBITOR SEPARATOR
B120.51
PY_VD-1610
CONDENSATE ACCUMULATOR
B110.08

Lead time and procurement

Lead time 100 ± 59 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
27 May 2026PR06
Regular replenishment
1Rp 9.8M07 Sept 2026103 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Sept 2026MediumPX_CL-457CL-457 DP high
12 Sept 2026MediumPX_CL-1686Repair insulation CL-1686
10 Sept 2026LowPX_CL-348Leak from packing
03 Sept 2026MediumPX_CL-1686Install scaffolding at CL-1686
21 Aug 2026MediumPX_CL-457Replace lamp as per PM finding
15 Jul 2026MediumPX_CL-962Replace lamp as per PM finding
14 Jul 2026MediumPX_CL-457Inspect CL-457 internal
24 Jun 2026MediumPX_CL-457Inspect CL-457 internal
16 Jun 2026MediumPX_CL-457CL-457 DP high
23 Apr 2026LowPX_CL-962Inspect CL-962 internal

Recent goods issues

Posting dateQtyOrderOrder type
29 Sept 20253201000004665Corrective
29 Sept 20252201000004665Corrective
26 Sept 20251201000037569Corrective