DEMISTER PAD,SIZE MZ267,INCOLOY

Material 4100096572 · DEMISTER PAD · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100096572
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 7 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
81 d · P80 147 d
Unit price
Rp 9.8M

Recommendation

  • 1.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~81 days; expected demand during lead time 0.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Long lead time: 80% of deliveries took up to 147 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 78.7M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
99.9%
stockout risk now 34%
Unit price
Rp 9.8M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 23 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.

Installed on 7 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-1618
METHANE SURGE DRUM
A140.93
PX_CL-1039
CHARGE GAS STRIPPER
A120.81
PX_CL-573
SLOP OIL STRIPPER
A100.38
PX_VD-1012
CHARGE GAS ACCUMULATOR
C100.08
PX_VD-1129
SEAL OIL SURGE DRUM
C100.08
PX_VD-999
ETHYLENE ACCUMULATOR
C200.08
PX_CL-443
COOLING WATER SCRUBBER
S162.52

Lead time and procurement

Lead time 81 ± 59 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
24 May 2025PR06
Regular replenishment
2Rp 9.8M19 Jun 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Sept 2026MediumPX_CL-443Replace lamp as per PM finding
15 Aug 2026LowPX_VD-1618Painting VD-1618
09 Jul 2026HighPX_CL-443CL-443 DP high
25 Jun 2026MediumPX_CL-443Leak from packing
12 May 2026MediumPX_CL-1039CL-1039 DP high
01 May 2026MediumPX_CL-443Install scaffolding at CL-443
30 Jan 2026LowPX_CL-443Replace lamp as per PM finding
16 Nov 2025MediumPX_VD-1618VD-1618 level glass broken
19 Sept 2025HighPX_VD-1618Leak from packing
18 Jun 2025MediumPX_CL-443PSM25/CL-443 DP high

Recent goods issues

Posting dateQtyOrderOrder type
08 Sept 20262201000031451Corrective