DEMISTER PAD,SIZE MZ267,INCOLOY
Material 4100096572 · DEMISTER PAD · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100096572
- Category
- DEMISTER PAD
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 7 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 81 d · P80 147 d
- Unit price
- Rp 9.8M
Recommendation
- 1.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~81 days; expected demand during lead time 0.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 8 now.
- 5.Long lead time: 80% of deliveries took up to 147 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 78.7M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
99.9%
stockout risk now 34%
Unit price
Rp 9.8M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 23 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.
Installed on 7 functional locations
3 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-1618 METHANE SURGE DRUM | A | 1 | 4 | 0.93 |
| PX_CL-1039 CHARGE GAS STRIPPER | A | 1 | 2 | 0.81 |
| PX_CL-573 SLOP OIL STRIPPER | A | 1 | 0 | 0.38 |
| PX_VD-1012 CHARGE GAS ACCUMULATOR | C | 1 | 0 | 0.08 |
| PX_VD-1129 SEAL OIL SURGE DRUM | C | 1 | 0 | 0.08 |
| PX_VD-999 ETHYLENE ACCUMULATOR | C | 2 | 0 | 0.08 |
| PX_CL-443 COOLING WATER SCRUBBER | S | 1 | 6 | 2.52 |
Lead time and procurement
Lead time 81 ± 59 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 May 2025 | PR06 Regular replenishment | 2 | Rp 9.8M | 19 Jun 2025 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Sept 2026 | Medium | PX_CL-443 | Replace lamp as per PM finding |
| 15 Aug 2026 | Low | PX_VD-1618 | Painting VD-1618 |
| 09 Jul 2026 | High | PX_CL-443 | CL-443 DP high |
| 25 Jun 2026 | Medium | PX_CL-443 | Leak from packing |
| 12 May 2026 | Medium | PX_CL-1039 | CL-1039 DP high |
| 01 May 2026 | Medium | PX_CL-443 | Install scaffolding at CL-443 |
| 30 Jan 2026 | Low | PX_CL-443 | Replace lamp as per PM finding |
| 16 Nov 2025 | Medium | PX_VD-1618 | VD-1618 level glass broken |
| 19 Sept 2025 | High | PX_VD-1618 | Leak from packing |
| 18 Jun 2025 | Medium | PX_CL-443 | PSM25/CL-443 DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Sept 2026 | 2 | 201000031451 | Corrective |