Sparely
DU

DEMISTER PAD,TYPE OO334,A105

Material 4100096603 · DEMISTER PAD · Plant 1000

AReorderCriticalStockout
Material
4100096603
Category
DEMISTER PAD
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
99 d · P80 147 d
Unit price
Rp 15.4M (est.)

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~99 days; expected demand during lead time 0.3.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 46.3M · order by 01 Oct 2026
Expected arrival ≈ 99 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.7%
stockout risk now 23%
Unit price
Rp 15.4M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 388 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 707.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-617
QUENCH OIL COLUMN
A152.52
PX_VD-1038
CONDENSATE SEPARATOR
A100.08
PY_CL-454
C3 RECYCLE TOWER
A100.38

Lead time and procurement

Lead time 99 ± 59 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_CL-617Inspect CL-617 internal
05 Aug 2026MediumPX_CL-617Inspect CL-617 internal
27 Mar 2026LowPX_CL-617CL-617 DP high
01 Oct 2025LowPX_CL-617CL-617 DP high
04 Jul 2025MediumPX_CL-617CL-617 DP high

Recent goods issues

Posting dateQtyOrderOrder type
08 Sept 20251201000037712Corrective