DEMISTER PAD,SIZE QG348,CS
Material 4100096685 · DEMISTER PAD · Plant 1000
AReorderCriticalStockout
- Material
- 4100096685
- Category
- DEMISTER PAD
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 99 d · P80 147 d
- Unit price
- Rp 15.4M (est.)
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~99 days; expected demand during lead time 0.4.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 61.7M · order by 01 Oct 2026
Expected arrival ≈ 99 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.4%
stockout risk now 30%
Unit price
Rp 15.4M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 27 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 952.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-910 QUENCH OIL SCRUBBER | A | 1 | 4 | 1.23 |
Lead time and procurement
Lead time 99 ± 59 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Aug 2026 | Medium | PX_CL-910 | Inspect CL-910 internal |
| 13 Jun 2026 | Medium | PX_CL-910 | Replace lamp as per PM finding |
| 10 Oct 2025 | Medium | PX_CL-910 | Install scaffolding at CL-910 |
| 14 May 2025 | Low | PX_CL-910 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Sept 2026 | 1 | 201000019996 | Corrective |
| 25 Jan 2026 | 1 | 201000024361 | Corrective |