DEMISTER PAD,TYPE WG311,INCOLOY

Material 4100096710 · DEMISTER PAD · Plant 1000

AReorderCriticalStockout
Material
4100096710
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
99 d · P80 147 d
Unit price
Rp 15.4M (est.)

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~99 days; expected demand during lead time 0.3.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 46.3M · order by 01 Oct 2026
Expected arrival ≈ 99 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.7%
stockout risk now 24%
Unit price
Rp 15.4M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 298 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 727.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-932
RICH AMINE COLUMN
A151.66
PX_CL-264
HYDROGEN COLUMN
S121.23

Lead time and procurement

Lead time 99 ± 59 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
31 Aug 2026LowPX_CL-932CL-932 DP high
20 Aug 2026MediumPX_CL-932CL-932 DP high
02 Jul 2026MediumPX_CL-932Inspect CL-932 internal
02 Jun 2026MediumPX_CL-932Install scaffolding at CL-932
14 Nov 2025MediumPX_CL-264Leak from packing
27 Jun 2025LowPX_CL-264CL-264 DP high
31 May 2025MediumPX_CL-932PSM25/Inspect CL-932 internal

Recent goods issues

Posting dateQtyOrderOrder type
07 Dec 20251201000008772Corrective