SCREW,TAPPING,M6X20MM,CS ZN
Material 4100098110 · SCREW · Plant 1000
AReorderCriticalStockout
- Material
- 4100098110
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (9 of 14 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 16 d · P80 19 d
- Unit price
- Rp 1,241
Recommendation
- 1.Forecast 12,895 EA/year: 12,895 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~16 days; expected demand during lead time 576.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2,076, order up to 14,561.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 14,561 now.
- 5.Installed on 14 FuncLoc(s), 9 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
Proposed purchase requisition
14,561 EA
Rp 18.1M · order by 01 Oct 2026
Expected arrival ≈ 16 days
ML early warningLast turnaround used 13,690Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2,076
safety stock 1,501
Rec. Max
14,561
order qty 12,485
Service level
99.9%
stockout risk now 88%
Unit price
Rp 1,241
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 41 issue days in the last 180 days, last issue 1 days ago, 111 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 11 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (13,730 units) excluded from the baseline.
Demand pattern Erratic · 128 issue days · 25 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 18.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 14 functional locations
9 with criticality A/B · 25,908 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 120 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 5,037 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 5,037 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1,500 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 120 | 38 | 14.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 120 | 28 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 50 | 23 | 9.01 |
| UT_JBX-691 JUNCTION BOX | A | 5,037 | 2 | 0.01 |
| PX_JBX-1547C JUNCTION BOX (EXP) | B | 1,500 | 0 | 0.01 |
| PX_JBX-1007A JUNCTION BOX | C | 1,500 | 0 | 0.01 |
| PX_JBX-1209 JUNCTION BOX (EXP) | C | 5,037 | 0 | 0.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 400 | 41 | 14.58 |
Lead time and procurement
Lead time 16 ± 9 days (PO history, 36 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Sept 2026 | PR06 Regular replenishment | 14,830 | Rp 1,191 | 28 Sept 2026 | 12 d |
| 31 Jul 2026 | PR03 Regular replenishment | 14,963 | Rp 1,223 | 15 Aug 2026 | 15 d |
| 21 Jul 2026 | PR03 Regular replenishment | 26,444 | Rp 1,252 | 29 Jul 2026 | 8 d |
| 17 Jul 2026 | PR03 Regular replenishment | 16,769 | Rp 1,203 | 03 Aug 2026 | 17 d |
| 11 Jul 2026 | PR06 Regular replenishment | 14,959 | Rp 1,275 | 07 Aug 2026 | 27 d |
| 02 Jul 2026 | PR03 Regular replenishment | 20,799 | Rp 1,257 | 14 Jul 2026 | 12 d |
| 08 Jun 2026 | PR06 Regular replenishment | 10,074 | Rp 1,265 | 20 Jun 2026 | 12 d |
| 20 May 2026 | PR06 Regular replenishment | 22,150 | Rp 1,280 | 09 Jun 2026 | 20 d |
| 15 May 2026 | PR03 Regular replenishment | 14,879 | Rp 1,259 | 03 Jun 2026 | 19 d |
| 13 May 2026 | PR03 Regular replenishment | 18,447 | Rp 1,252 | 26 May 2026 | 13 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 500 | 201000024363 | Corrective |
| 26 Sept 2026 | 100 | 201000025207 | Corrective |
| 23 Sept 2026 | 50 | 209000029477 | Other maintenance |
| 22 Sept 2026 | 20 | 201000024105 | Corrective |
| 17 Sept 2026 | 50 | 201000029503 | Corrective |
| 09 Sept 2026 | 20 | 201000027353 | Corrective |
| 04 Sept 2026 | 50 | 201000031484 | Corrective |
| 31 Aug 2026 | 50 | 201000003615 | Corrective |
| 28 Aug 2026 | 20 | 201000023904 | Corrective |
| 24 Aug 2026 | 20 | 201000039454 | Corrective |
| 15 Aug 2026 | 200 | 201000011364 | Corrective |
| 15 Aug 2026 | 50 | 201000020105 | Corrective |
| 11 Aug 2026 | 100 | 201000002355 | Corrective |
| 27 Jul 2026 | 20 | 201000002237 | Corrective |
| 27 Jul 2026 | 100 | 201000021734 | Corrective |