Sparely
DU

SCREW,TAPPING,M6X20MM,CS ZN

Material 4100098110 · SCREW · Plant 1000

AReorderCriticalStockout
Material
4100098110
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (9 of 14 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
16 d · P80 19 d
Unit price
Rp 1,241

Recommendation

  • 1.Forecast 12,895 EA/year: 12,895 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~16 days; expected demand during lead time 576.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2,076, order up to 14,561.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 14,561 now.
  • 5.Installed on 14 FuncLoc(s), 9 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Proposed purchase requisition
14,561 EA
Rp 18.1M · order by 01 Oct 2026
Expected arrival ≈ 16 days
ML early warningLast turnaround used 13,690Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2,076
safety stock 1,501
Rec. Max
14,561
order qty 12,485
Service level
99.9%
stockout risk now 88%
Unit price
Rp 1,241
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 41 issue days in the last 180 days, last issue 1 days ago, 111 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 11 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (13,730 units) excluded from the baseline.

Demand pattern Erratic · 128 issue days · 25 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 14 functional locations

9 with criticality A/B · 25,908 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A12011442.86
PX_BF-106
CRACKING FURNACE BF-106
A5,0378230.86
PX_BF-112
CRACKING FURNACE BF-112
A5,0377327.01
PX_BF-102
CRACKING FURNACE BF-102
A1,5007128.72
PX_BF-103
CRACKING FURNACE BF-103
A1203814.58
PX_BF-104
CRACKING FURNACE BF-104
A1202811.58
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
UT_JBX-691
JUNCTION BOX
A5,03720.01
PX_JBX-1547C
JUNCTION BOX (EXP)
B1,50000.01
PX_JBX-1007A
JUNCTION BOX
C1,50000.01
PX_JBX-1209
JUNCTION BOX (EXP)
C5,03700.01
PX_BF-110
CRACKING FURNACE BF-110
S4004114.58

Lead time and procurement

Lead time 16 ± 9 days (PO history, 36 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
16 Sept 2026PR06
Regular replenishment
14,830Rp 1,19128 Sept 202612 d
31 Jul 2026PR03
Regular replenishment
14,963Rp 1,22315 Aug 202615 d
21 Jul 2026PR03
Regular replenishment
26,444Rp 1,25229 Jul 20268 d
17 Jul 2026PR03
Regular replenishment
16,769Rp 1,20303 Aug 202617 d
11 Jul 2026PR06
Regular replenishment
14,959Rp 1,27507 Aug 202627 d
02 Jul 2026PR03
Regular replenishment
20,799Rp 1,25714 Jul 202612 d
08 Jun 2026PR06
Regular replenishment
10,074Rp 1,26520 Jun 202612 d
20 May 2026PR06
Regular replenishment
22,150Rp 1,28009 Jun 202620 d
15 May 2026PR03
Regular replenishment
14,879Rp 1,25903 Jun 202619 d
13 May 2026PR03
Regular replenishment
18,447Rp 1,25226 May 202613 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 2026500201000024363Corrective
26 Sept 2026100201000025207Corrective
23 Sept 202650209000029477Other maintenance
22 Sept 202620201000024105Corrective
17 Sept 202650201000029503Corrective
09 Sept 202620201000027353Corrective
04 Sept 202650201000031484Corrective
31 Aug 202650201000003615Corrective
28 Aug 202620201000023904Corrective
24 Aug 202620201000039454Corrective
15 Aug 2026200201000011364Corrective
15 Aug 202650201000020105Corrective
11 Aug 2026100201000002355Corrective
27 Jul 202620201000002237Corrective
27 Jul 2026100201000021734Corrective