SCREW,TAPPING,M3X10MM,SS304
Material 4100098146 · SCREW · Plant 1000
AMonitorHealthy
- Material
- 4100098146
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 9 FuncLocs A/B)
- Supplier
- BERKAH INDUSTRI NUSANTARA PT
- Lead time
- 20 d · P80 30 d
- Unit price
- Rp 2,089
Recommendation
- 1.Forecast 7,233 EA/year: 7,233 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~20 days; expected demand during lead time 386.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,318, order up to 8,526.
- 4.Installed on 9 FuncLoc(s), 7 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 5,560Single sourceAbnormal consumptionSame description as 1 other material number
On hand / on order
4,379 / 0
no open PO
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
1,318
safety stock 932
Rec. Max
8,526
order qty 7,208
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2,089
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 23 issue days in the last 180 days, last issue 3 days ago, 76 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 11 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (5,600 units) excluded from the baseline.
Demand pattern Erratic · 69 issue days · 12 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 9 functional locations
7 with criticality A/B · 7,937 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 120 | 114 | 42.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 120 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 5,037 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 120 | 29 | 11.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 120 | 28 | 11.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 120 | 23 | 9.01 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1,500 | 23 | 9.01 |
| PX_JBX-1192B JUNCTION BOX | C | 400 | 0 | 0.01 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 400 | 8 | 3.02 |
Lead time and procurement
Lead time 20 ± 10 days (PO history, 30 PO lines) · on-time 46%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Sept 2026 | PR03 Regular replenishment | 13,130 | Rp 2,120 | 25 Sept 2026 | 21 d |
| 31 Aug 2026 | PR03 Regular replenishment | 9,331 | Rp 2,031 | 15 Sept 2026 | 15 d |
| 25 Aug 2026 | PR06 Regular replenishment | 7,501 | Rp 2,053 | 03 Sept 2026 | 9 d |
| 08 Aug 2026 | PR03 Regular replenishment | 11,532 | Rp 2,089 | 24 Aug 2026 | 16 d |
| 05 Aug 2026 | PR03 Regular replenishment | 4,121 | Rp 2,112 | 30 Aug 2026 | 25 d |
| 09 Jul 2026 | PR01 Import / long-lead | 10,917 | Rp 1,995 | 13 Aug 2026 | 35 d |
| 24 Jun 2026 | PR01 Import / long-lead | 12,443 | Rp 2,161 | 24 Jul 2026 | 30 d |
| 22 May 2026 | PR03 Regular replenishment | 5,721 | Rp 2,109 | 11 Jun 2026 | 20 d |
| 21 May 2026 | PR03 Regular replenishment | 7,992 | Rp 2,019 | 23 Jun 2026 | 33 d |
| 20 May 2026 | PR06 Regular replenishment | 3,869 | Rp 2,005 | 04 Jun 2026 | 15 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Sept 2026 | 200 | 201000001477 | Corrective |
| 16 Sept 2026 | 200 | 201000023922 | Corrective |
| 13 Sept 2026 | 20 | 201000019950 | Corrective |
| 27 Aug 2026 | 100 | 201000015396 | Corrective |
| 27 Aug 2026 | 50 | 201000029977 | Corrective |
| 25 Aug 2026 | 50 | 201000024850 | Corrective |
| 12 Aug 2026 | 50 | 201000029354 | Corrective |
| 19 Jul 2026 | 500 | 201000028005 | Corrective |
| 17 Jul 2026 | 500 | 201000004050 | Corrective |
| 14 Jul 2026 | 20 | 201000006682 | Corrective |
| 30 Jun 2026 | 20 | 209000022177 | Other maintenance |
| 28 Jun 2026 | 200 | 201000031561 | Corrective |
| 25 Jun 2026 | 50 | 201000031485 | Corrective |
| 15 Jun 2026 | 100 | 201000004242 | Corrective |
| 31 May 2026 | 50 | 201000027069 | Corrective |