SCREW,TAPPING,M5X25MM,SS304

Material 4100098171 · SCREW · Plant 1000

AMonitorHealthy
Material
4100098171
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 7 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
30 d · P80 37 d
Unit price
Rp 1,866

Recommendation

  • 1.Forecast 4,048 EA/year: 4,048 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~30 days; expected demand during lead time 332.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,383, order up to 5,431.
  • 4.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
  • 5.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 120Single sourceAbnormal consumptionOpen PO
On hand / on order
2,190 / 6,400
next delivery 04 Oct 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
1,383
safety stock 1,052
Rec. Max
5,431
order qty 4,048
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1,866
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 1 days ago, 24 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (220 units) excluded from the baseline.

Demand pattern Erratic · 28 issue days · 6 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 7 functional locations

3 with criticality A/B · 9,287 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A1,5002811.58
PX_BF-111
CRACKING FURNACE BF-111
A400239.01
UT_JBX-691
JUNCTION BOX
A40020.01
PX_JBX-567B
JUNCTION BOX
C5000.01
PX_JBX-962
JUNCTION BOX
C40000.01
PX_BF-110
CRACKING FURNACE BF-110
S5,0374114.58
PX_JBX-1567
JUNCTION BOX
S1,50000.01

Lead time and procurement

Lead time 30 ± 12 days (PO history, 11 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
28 Aug 2026PR03
Regular replenishment
6,400Rp 1,94404 Oct 2026
open
37 d
02 Aug 2026PR06
Regular replenishment
5,889Rp 1,99219 Sept 202648 d
21 Jul 2026PR06
Regular replenishment
8,978Rp 1,92312 Aug 202622 d
16 Mar 2026PR03
Regular replenishment
6,996Rp 1,82902 Apr 202617 d
11 Jan 2026PR06
Regular replenishment
9,336Rp 1,86613 Feb 202633 d
05 Jan 2026PR03
Regular replenishment
8,564Rp 1,85924 Jan 202619 d
28 Dec 2025PR03
Regular replenishment
8,369Rp 1,90226 Jan 202629 d
20 Dec 2025PR03
Regular replenishment
9,257Rp 1,85013 Jan 202624 d
07 Dec 2025PR06
Regular replenishment
8,616Rp 1,85012 Jan 202636 d
19 Sept 2025PR05
Project / turnaround
10,661Rp 1,92726 Oct 202537 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
11 Sept 2026MediumPX_BF-110Leak from packing
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20265,000201000019136Corrective
28 Aug 202650203000017844Turnaround
04 Aug 202650201000010969Corrective
24 Jul 2026500201000034014Corrective
19 Jul 2026100201000028005Corrective
13 Jul 202620201000028281Corrective
24 Jun 2026100201000038239Corrective
05 Apr 2026500201000010228Corrective
14 Feb 2026100201000034114Corrective
28 Jan 2026100201000020819Corrective
27 Jan 202650201000013595Corrective
27 Jan 20261,000201000020819Corrective
23 Jan 2026200201000006146Corrective
12 Jan 2026100201000039896Corrective
28 Dec 2025100203000006078Turnaround