SCREW,TAPPING,M4X25MM,CS ZN
Material 4100098180 · SCREW · Plant 1000
AMonitorHealthy
- Material
- 4100098180
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- CAHAYA PERKASA ABADI PT
- Lead time
- 24 d · P80 30 d
- Unit price
- Rp 1,879
Recommendation
- 1.Forecast 6,247 EA/year: 6,247 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~24 days; expected demand during lead time 416.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,679, order up to 7,927.
- 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 750Single sourceAbnormal consumptionOpen PO
On hand / on order
6,031 / 9,713
next delivery 11 Oct 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
1,679
safety stock 1,264
Rec. Max
7,927
order qty 6,248
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1,879
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 14 issue days in the last 180 days, last issue 9 days ago, 27 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (890 units) excluded from the baseline.
Demand pattern Erratic · 45 issue days · 10 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 5,487 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 400 | 73 | 27.01 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 5,037 | 28 | 11.58 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 50 | 23 | 9.44 |
Lead time and procurement
Lead time 24 ± 11 days (PO history, 19 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Aug 2026 | PR01 Import / long-lead | 9,713 | Rp 1,888 | 11 Oct 2026 open | 54 d |
| 04 Aug 2026 | PR06 Regular replenishment | 6,513 | Rp 1,902 | 01 Sept 2026 | 28 d |
| 29 May 2026 | PR03 Regular replenishment | 4,616 | Rp 1,799 | 05 Jul 2026 | 37 d |
| 08 Apr 2026 | PR06 Regular replenishment | 5,502 | Rp 1,949 | 28 Apr 2026 | 20 d |
| 21 Mar 2026 | PR06 Regular replenishment | 7,764 | Rp 1,833 | 07 Apr 2026 | 17 d |
| 20 Mar 2026 | PR03 Regular replenishment | 12,516 | Rp 1,931 | 14 Apr 2026 | 25 d |
| 16 Mar 2026 | PR03 Regular replenishment | 5,942 | Rp 1,907 | 15 Apr 2026 | 30 d |
| 16 Feb 2026 | PR03 Regular replenishment | 9,304 | Rp 1,884 | 17 Mar 2026 | 29 d |
| 27 Jan 2026 | PR03 Regular replenishment | 9,450 | Rp 1,837 | 10 Mar 2026 | 42 d |
| 16 Jan 2026 | PR03 Regular replenishment | 7,990 | Rp 1,879 | 01 Feb 2026 | 16 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Sept 2026 | 100 | 209000029477 | Other maintenance |
| 03 Sept 2026 | 20 | 201000019996 | Corrective |
| 30 Aug 2026 | 5,000 | 201000018854 | Corrective |
| 21 Aug 2026 | 50 | 201000007325 | Corrective |
| 16 Aug 2026 | 100 | 209000023087 | Other maintenance |
| 02 Aug 2026 | 20 | 201000026506 | Corrective |
| 06 Jul 2026 | 100 | 209000017779 | Other maintenance |
| 03 Jul 2026 | 100 | 201000035815 | Corrective |
| 01 Jul 2026 | 20 | 201000025988 | Corrective |
| 01 Jul 2026 | 20 | 209000017779 | Other maintenance |
| 24 Jun 2026 | 1,000 | 209000014083 | Other maintenance |
| 23 Jun 2026 | 5,000 | 201000035960 | Corrective |
| 04 Jun 2026 | 500 | 201000022908 | Corrective |
| 29 Apr 2026 | 100 | 205000012364 | Other maintenance |
| 07 Apr 2026 | 200 | 201000030342 | Corrective |