SCREW,TAPPING,M3X20MM,SS304
Material 4100098221 · SCREW · Plant 1000
AMonitorHealthy
- Material
- 4100098221
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 45 d · P80 66 d
- Unit price
- Rp 1,049
Recommendation
- 1.Forecast 2,256 EA/year: 2,256 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~45 days; expected demand during lead time 279.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,001, order up to 3,258.
- 4.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 420Single sourceAbnormal consumptionOpen PO
On hand / on order
1,154 / 9,527
next delivery 16 Nov 2026
Today Min / Max
720 / 1,169
static parameters in BoM
Rec. Min (reorder point)
1,001
safety stock 722
Rec. Max
3,258
order qty 2,257
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1,049
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 9 issue days in the last 180 days, last issue 15 days ago, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 8 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (5,690 units) excluded from the baseline.
Demand pattern Erratic · 27 issue days · 9 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
2 with criticality A/B · 5,397 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 5,037 | 38 | 14.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 120 | 23 | 9.01 |
| PX_JBX-192 JUNCTION BOX (EXP) | C | 120 | 0 | 0.01 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 120 | 8 | 3.02 |
Lead time and procurement
Lead time 45 ± 20 days (PO history, 21 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Sept 2026 | PR03 Regular replenishment | 9,527 | Rp 1,011 | 16 Nov 2026 open | 66 d |
| 03 Aug 2026 | PR03 Regular replenishment | 11,842 | Rp 1,066 | 16 Sept 2026 | 44 d |
| 24 Jul 2026 | PR03 Regular replenishment | 7,056 | Rp 1,049 | 10 Aug 2026 | 17 d |
| 03 Jul 2026 | PR03 Regular replenishment | 11,846 | Rp 1,060 | 15 Aug 2026 | 43 d |
| 24 Jun 2026 | PR03 Regular replenishment | 9,086 | Rp 1,071 | 01 Aug 2026 | 38 d |
| 13 May 2026 | PR01 Import / long-lead | 7,063 | Rp 1,034 | 17 Aug 2026 | 96 d |
| 09 May 2026 | PR06 Regular replenishment | 11,529 | Rp 1,050 | 26 May 2026 | 17 d |
| 23 Apr 2026 | PR06 Regular replenishment | 4,855 | Rp 1,069 | 02 Jun 2026 | 40 d |
| 18 Mar 2026 | PR06 Regular replenishment | 12,110 | Rp 1,052 | 16 Apr 2026 | 29 d |
| 01 Feb 2026 | PR06 Regular replenishment | 6,286 | Rp 1,073 | 28 Mar 2026 | 55 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 26 Aug 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_BF-103 | Hot spot at convection BF-103 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Sept 2026 | 500 | 201000036704 | Corrective |
| 10 Sept 2026 | 20 | 201000016998 | Corrective |
| 10 Sept 2026 | 5,000 | 201000035065 | Corrective |
| 29 Aug 2026 | 20 | 201000038773 | Corrective |
| 23 Aug 2026 | 50 | 201000025267 | Corrective |
| 14 Aug 2026 | 100 | 201000039930 | Corrective |
| 22 Jul 2026 | 50 | 201000023809 | Corrective |
| 29 Jun 2026 | 20 | 201000006253 | Corrective |
| 17 Jun 2026 | 50 | 201000020554 | Corrective |
| 16 Apr 2026 | 5,000 | 201000025702 | Corrective |
| 03 Apr 2026 | 1,000 | 201000001686 | Corrective |
| 14 Mar 2026 | 20 | 201000029505 | Corrective |
| 03 Mar 2026 | 20 | 201000004517 | Corrective |
| 09 Feb 2026 | 50 | 203000032991 | Turnaround |
| 04 Feb 2026 | 200 | 201000000993 | Corrective |