SCREW,TAPPING,M3X16MM,CS ZN

Material 4100098240 · SCREW · Plant 1000

SReorderHighStockout
Material
4100098240
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
15 d · P80 16 d
Unit price
Rp 1,538

Recommendation

  • 1.Forecast 923 EA/year: 923 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~15 days; expected demand during lead time 37.
  • 3.A 95.5% service level gives the lowest holding + downtime-risk cost: reorder at 110, order up to 1,034.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 1,034 now.
  • 5.ML early warning: 92% probability of demand in the next 90 days.
Proposed purchase requisition
1,034 EA
Rp 1.6M · order by 01 Oct 2026
Expected arrival ≈ 15 days
ML early warningLast turnaround used 620Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
174 / 355
static parameters in BoM
Rec. Min (reorder point)
110
safety stock 74
Rec. Max
1,034
order qty 924
Service level
95.5%
stockout risk now 29%
Unit price
Rp 1,538
PO history
ML early warning: 92% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 54 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (620 units) excluded from the baseline.

Demand pattern Lumpy · 14 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~10 days.

Installed on 1 functional locations

0 with criticality A/B · 50 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-108
CRACKING FURNACE BF-108
S50239.44

Lead time and procurement

Lead time 15 ± 7 days (PO history, 7 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
27 Aug 2026PR06
Regular replenishment
1,750Rp 1,56403 Sept 20267 d
19 Jun 2026PR04
Regular (other)
1,652Rp 1,53830 Jun 202611 d
15 May 2026PR06
Regular replenishment
692Rp 1,55828 May 202613 d
26 Aug 2025PR01
Import / long-lead
866Rp 1,49912 Sept 202517 d
10 Jul 2025PR06
Regular replenishment
1,837Rp 1,49316 Jul 20256 d
23 Jun 2025PR03
Regular replenishment
1,269Rp 1,55104 Jul 202511 d
30 May 2025PR03
Regular replenishment
751Rp 1,50020 Jun 202521 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Posting dateQtyOrderOrder type
08 Aug 202650201000036904Corrective
27 Jul 2026500201000030925Corrective
15 May 202620201000030099Corrective
04 Mar 202650201000026555Corrective
31 Jan 202650201000004149Corrective
30 Jan 2026100204000034161Preventive
26 Dec 2025100203000001878Turnaround
20 Dec 2025500203000014056Turnaround
18 Dec 202550201000031381Corrective
11 Dec 20251,000201000031427Corrective
01 Dec 2025100201000006865Corrective
24 Nov 2025200201000017774Corrective
08 Nov 202520203000029164Turnaround
26 Oct 202550201000000180Corrective
19 Sept 20251,000209000019126Other maintenance
Sparely