SCREW,TAPPING,M5X25MM,CS ZN
Material 4100098244 · SCREW · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100098244
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- DUTA INSTRUMEN JAYA PT
- Lead time
- 20 d · P80 33 d
- Unit price
- Rp 381
Recommendation
- 1.Forecast 866 EA/year: 866 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 46.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 400, order up to 1,266.
- 4.On hand 53 + on order 0 is at or below the reorder point: order 1,213 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1,213 EA
Rp 462,153 · order by 01 Oct 2026
Expected arrival ≈ 20 days
Single source
On hand / on order
53 / 0
no open PO
Today Min / Max
51 / 104
static parameters in BoM
Rec. Min (reorder point)
400
safety stock 354
Rec. Max
1,266
order qty 866
Service level
100.0%
stockout risk now 37%
Unit price
Rp 381
PO history
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 54 days ago, 24 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (20 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 1,670 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-104 CRACKING FURNACE BF-104 | A | 50 | 28 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 120 | 23 | 9.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 1,500 | 41 | 14.58 |
Lead time and procurement
Lead time 20 ± 12 days (PO history + category, 2 PO lines) · on-time 0%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2025 | PR06 Regular replenishment | 41 | Rp 379 | 13 Oct 2025 | 26 d |
| 21 Jun 2025 | PR06 Regular replenishment | 29 | Rp 383 | 03 Jul 2025 | 12 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Aug 2026 | 100 | 201000023316 | Corrective |
| 26 Apr 2026 | 100 | 201000031464 | Corrective |
| 29 Jun 2025 | 20 | 203000034428 | Turnaround |