SCREW,TAPPING,M6X10MM,SS304

Material 4100098420 · SCREW · Plant 1000

CReduceSlow-moving
Material
4100098420
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
20 d · P80 33 d
Unit price
Rp 1,538 (est.)

Recommendation

  • 1.Forecast 14 EA/year: 14 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 0.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
  • 4.Stock 217 exceeds the level to keep (100) by 117.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
217 / 0
no open PO
Today Min / Max
11 / 27
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 50
Rec. Max
100
order qty 50
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 0% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 467 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 1 functional locations

0 with criticality A/B · 5,037 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-279
JUNCTION BOX
C5,03710.01

Lead time and procurement

Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 May 2025MediumPX_JBX-279Replace gland JBX-279

Recent goods issues

Posting dateQtyOrderOrder type
21 Jun 202550201000002543Corrective
19 Jun 202550201000002543Corrective