SCREW,TAPPING,M6X16MM,CS ZN
Material 4100098488 · SCREW · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100098488
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 20 d · P80 33 d
- Unit price
- Rp 1,538 (est.)
Recommendation
- 1.Forecast 129 EA/year: 129 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~20 days; expected demand during lead time 7.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 234, order up to 364.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
234
safety stock 227
Rec. Max
364
order qty 130
Service level
100.0%
stockout risk now 6%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 237.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 1 functional locations
1 with criticality A/B · 5,037 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 5,037 | 73 | 27.01 |
Lead time and procurement
Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
| 31 Aug 2026 | Medium | PX_BF-112 | Install cover plate for MCP cracking |
| 17 Aug 2026 | Medium | PX_BF-112 | Painting BF-112 |
| 15 Aug 2026 | Low | PX_BF-112 | Decoking follow up BF-112 |
Recent goods issues
Never issued in the 17-month history.