SCREW,TAPPING,M4X25MM,SS304

Material 4100098499 · SCREW · Plant 1000

AReorderCriticalSlow-moving
Material
4100098499
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
20 d · P80 33 d
Unit price
Rp 1,538 (est.)

Recommendation

  • 1.Forecast 1,676 EA/year: 1,676 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 92.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 500, order up to 2,176.
  • 4.On hand 24 + on order 0 is at or below the reorder point: order 2,152 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2,152 EA
Rp 3.3M · order by 01 Oct 2026
Expected arrival ≈ 20 days
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
24 / 0
no open PO
Today Min / Max
10 / 29
static parameters in BoM
Rec. Min (reorder point)
500
safety stock 409
Rec. Max
2,176
order qty 1,676
Service level
100.0%
stockout risk now 60%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 281 days ago, 37 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 6,657 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A5,0377128.72
PX_BF-103
CRACKING FURNACE BF-103
A1,5003814.58
PX_BF-110
CRACKING FURNACE BF-110
S1204114.58

Lead time and procurement

Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
11 Sept 2026MediumPX_BF-110Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
24 Dec 2025100201000004131Corrective