SCREW,TAPPING,M4X25MM,SS304
Material 4100098499 · SCREW · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100098499
- Category
- SCREW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 20 d · P80 33 d
- Unit price
- Rp 1,538 (est.)
Recommendation
- 1.Forecast 1,676 EA/year: 1,676 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 92.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 500, order up to 2,176.
- 4.On hand 24 + on order 0 is at or below the reorder point: order 2,152 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2,152 EA
Rp 3.3M · order by 01 Oct 2026
Expected arrival ≈ 20 days
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
24 / 0
no open PO
Today Min / Max
10 / 29
static parameters in BoM
Rec. Min (reorder point)
500
safety stock 409
Rec. Max
2,176
order qty 1,676
Service level
100.0%
stockout risk now 60%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 281 days ago, 37 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 6,657 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 5,037 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1,500 | 38 | 14.58 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 120 | 41 | 14.58 |
Lead time and procurement
Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Dec 2025 | 100 | 201000004131 | Corrective |