SCREW,TAPPING,M6X25MM,CS ZN

Material 4100098646 · SCREW · Plant 1000

AMonitorCritical insurance spare
Material
4100098646
Category
SCREW
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
20 d · P80 33 d
Unit price
Rp 1,538 (est.)

Recommendation

  • 1.Forecast 129 EA/year: 129 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~20 days; expected demand during lead time 7.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 234, order up to 364.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
19 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
234
safety stock 227
Rec. Max
364
order qty 130
Service level
100.0%
stockout risk now 6%
Unit price
Rp 1,538
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 237.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 1 functional locations

1 with criticality A/B · 120 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A1207327.01

Lead time and procurement

Lead time 20 ± 12 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking
17 Aug 2026MediumPX_BF-112Painting BF-112
15 Aug 2026LowPX_BF-112Decoking follow up BF-112

Recent goods issues

Never issued in the 17-month history.